970x250
750x300
General news

VRA starts a controlled leak at the Kpong and Akosombo Dams

 

Starting on Friday, September 15, 2023, the Volta River Authority (VRA) will start a controlled release at the Akosombo and Kpong Dams.

VRA starts a controlled leak at the Kpong and Akosombo Dams
VRA starts a controlled leak at the Kpong and Akosombo Dams

This choice was made as a result of the lake level continuously rising due to significant inflows, as mentioned by Deputy Chief Executive, E&O, Ing. Edward Obeng Kenzo.

Additionally, VRA has implemented this controlled spillage as a preventive precaution in order to limit any negative effects because it is well aware that the widespread, heavy rainfall is causing flooding and raised water levels in several localities.

The public is reassured that they will continuously evaluate the situation and provide updates as necessary.

VRA starts a controlled leak at the Kpong and Akosombo Dams
VRA starts a controlled leak at the Kpong and Akosombo Dams

Other stories

 

READ ALSO  PATRICK KUMOR CAN'T BE MCE , APPOINT ANOTHER NOMINEE -- GROUP TELLS PRESIDENT.

Show More
Back to top button
Design by FLY MULTIMEDIA GHANA

Adblock Detected

Please consider supporting us by disabling your ad blocker